Portal de Beniel

www.portaldebeniel.com

Beniel - SpanishBeniel - English
detail of Beniel

 

[The Community completes the works of the drainage collectors and rainwater collection in the urban area of ??Beniel (09/12/2020)

| The regional government has invested 416,686 euros in this action that will benefit more than 5,000 inhabitants | Five collectors have been installed with a total length close to 1,000 meters The Autonomous Community has completed the works on the drainage collectors and rainwater collection carried out in the urban area of ??Beniel, which involve "complying with the commitment acquired with the residents of this municipality to improve their quality of life and conditions of its streets, especially during rainy episodes, "according to the Minister of Water, Agriculture, Livestock, Fisheries and Environment, Antonio Luengo, today.

The counselor visited the area where these collectors have been installed, which have involved an investment of 416,686 euros and will benefit a population of more than 5,000 inhabitants, "which reaffirms the regional government's commitment to provide the populations with basic sanitation infrastructures, "explained Luengo.

In this sense, he pointed out that "the collectors built in Beniel solve an important problem of rainwater in the urban area of ??this municipality, mainly on Avenida Calvo Sotelo, which was affected by traffic cuts during rain episodes.

, due to breaks due to the existing networks being on the counter slope ".

He also highlighted "the improvement of water catchment in the roundabout at the entrance to the municipality, one of the points most affected by the accumulation of water." The works have consisted of the construction of several collectors distributed throughout the urban area of ??the town.The first section of pipe, with a length of 462 meters, runs from Carril de los Florencios to R o Duero street.

The second section, with a length of 120 meters, goes from the southern area of ??the RM-820 to the vicinity of Rocasa.

For its part, the rainwater collector from Avenida Calvo Sotelo up to the intersection with Calle Gironda, has a 125 m long PVC pipe and 6 manholes, which significantly improves drainage capacity of rainwater in the area of ??the access roundabout to the urban area of ??Beniel.

Another section of the collector was made in parallel to the existing network, very deteriorated due to its age, whose pipeline was replaced by another 80 m long PVC pipe, up to Calle R o Duero.

Finally, another collector runs along Avenida de Calvo Sotelo, from Calle Raal to Avenida Jos Pujante, with a total length of 219 m and PVC pipe of 500 mm in diameter.

function { ;(, , {});}

Source: CARM

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información